ACB Bank – Van Lang Branch
Location
01 Quang Trung and, 01 - 05 Nguyen Oanh, Ward 10, Go Vap, Ho Chi Minh City
Area
1000 m2
Package
Build
Completion Time
October, 2023
Building an "outdoor office" in a giant concrete office building block
Central to the Văn Lang project is our strategic use of bamboo, a material chosen for its sustainability and aesthetic qualities. Bamboo is renowned for its rapid growth and ability to sequester carbon, making it an eco-friendly alternative to traditional construction materials. This choice reflects our commitment to reducing environmental impact and enhancing the structural beauty of our projects.
The construction of the Văn Lang branch was guided by Han Spaces’ rigorous standards, which emphasize durability, functionality, and minimal environmental footprint. We employ modern construction techniques that optimize resource efficiency, reduce waste, and ensure that the structure meets the highest quality and sustainability benchmarks.
Designed to be energy-efficient, the Văn Lang branch integrates state-of-the-art HVAC systems, LED lighting, and intelligent building management systems. These technologies collectively reduce the building’s energy consumption and operational costs, while smart landscape design incorporates drought-resistant native plants to further enhance the branch’s sustainability.
The design of the Văn Lang branch prioritizes the comfort and well-being of both clients and staff. The inclusion of natural elements and green spaces not only provides a tranquil and inviting atmosphere but also improves indoor air quality. This focus on human-centric design fosters a positive environment for community engagement and customer service.